Rock tour
Problem description
Drive the rock bus from show to show, but schedule shows only on available days.
Hard constraints:
-
Schedule every required show.
-
Schedule as many shows as possible.
Medium constraints:
-
Maximize revenue opportunity.
-
Minimize driving time.
-
Visit sooner than later.
Soft constraints:
-
Avoid long driving times.